We represented a general contractor to negotiate a $2.5 million stipulated sum Owner-Contractor Agreement for a substantial addition and alteration to an existing single-family residence. The contract included a value engineering clause to potentially reduce costs, with any savings reallocated to the contingency fund. The complexity of working on an occupied residence, plus an aggressive 550-day timeline and potential liquidated damages, required careful drafting and negotiation.